Box Springs Wind Project
- 6 MW windfarm located in Medicine Hat, Alberta
- Commissioned in 2014 using three 78 m tall Gamesa G90 turbines
- 20 year fixed price PPA with the City of Medicine Hat (“bundled” green electricity plus carbon offsets)
- Largest windfarm in Canada built within a city boundary
- WindRiver Power is the majority owner of the windfarm
Hunter Creek Hydro Project
- 11 MW run-of-river hydro project located near Hope, B.C.
- Commissioned in 2018 using single 6-jet vertical pelton turbine
- 40 year fixed price PPA with BC Hydro (“bundled” green electricity plus carbon offsets)
- Joint owners with the Shxw’owhámél First Nation and Connor, Clark and Lunn Infrastructure
Sakwi Creek Hydro Project
- 6 MW run-of-river hydro project located near Harrison Hot Springs, B.C.
- Commissioned in 2014 using single 2-jet horizontal pelton turbine
- 40 year fixed price PPA with BC Hydro (“bundled” green electricity plus carbon offsets)
- Joint owners with the Sts’ailes First Nation and Connor, Clark and Lunn Infrastructure
- 850 metres of gross head – 2nd highest in British Columbia